The five stages every Sydney new build should be inspected at
Stage one — slab and footings — is the last chance to verify reinforcement, formwork and set-out before concrete is poured. Stage two — frame — checks stud spacing, wall bracing, hold-downs and roof truss connections against the engineer's design. Stage three — pre-lining / lock-up — reviews waterproofing, flashings, insulation and services before plasterboard is fixed.
Stage four — fixing — verifies internal linings, tiling, cabinetry and waterproofing to bathrooms. Stage five — Practical Completion Inspection (PCI) — is your final opportunity to compile a builder defect list before you make final payment and take possession.